References

Client

Cofely Gebäudetechnik GmbH
Austria

Information

Category: 
  • Building survey for the integration of the energy-optimization installation in the existing system
  • Nature measures that will accommodate  to more efficient devices
  • Set up of the conduction connections on site. Integration of the new supply in the inventory
  • Determination of the individual air volume flows in inventory. Allocation to the new devices.
  • Creating implementation plans of heating distribution with new connections in 3D
  • Creating implementation plans of the ventilation station with new connections to the existing riser shafts in 3D
  • Revising the schemes Plans
  • Mass determination with 3D CAD system that will facilitate the work of the customer
  • Coordination ELT find the optimal way through the technical control center
  • Complete renovation of the heating system from the power supply to the radiator in 3 shoots